Formation of Joint Venture at the Molyhil Tungsten Project, NT
The Directors of Thor Mining (THR) are pleased to announce a joint venture Agreement with ASX-listed Investigator Resources Limited (“IVR”),
The Directors of Thor Mining (THR) are pleased to announce a joint venture Agreement with ASX-listed Investigator Resources Limited (“IVR”),
The Directors of Thor Mining (THR) are pleased to announce the funding agreement to accelerated exploration of the Molyhil and Bonya Tungsten Projects
The Directors of Thor Mining (THR) are pleased to announce the funding agreement to accelerated exploration of the Molyhil and Bonya Tungsten Projects
Maiden 2000m drilling program to commence in mid-September 2022 at the Wedding Bell and Radium Mountain Projects. Site preparation has commenced.
The 2nd hole in the drilling program intercepted scheelite, molybdenite and chalcopyrite mineralisation within a magnetite skarn, at the Molyhil Project.
The Molyhil Mineral Resource Estimate now comprises Measured, Indicated, and Inferred Mineral Resources totalling 4.4 million tonnes at 0.27% WO3 (Tungsten trioxide), 0.10% Mo (Molybdenum), 0.05% Cu (Copper) and 17.75% Fe (Iron).
Thor Mining and Arafura Resources are pleased to advise maiden mineral resource estimates for the copper deposits at Bonya, adjacent to the Thor Mining Molyhil tungsten and molybdenum project.