The directors of Thor Energy Plc (AIM, ASX: THR) are pleased to provide a drilling update on the Company’s 100% owned Wedding Bell and Radium Mountain Projects, located in the uranium-vanadium mining district of the Uravan Mineral Belt, southwest Colorado, USA.
HIGHLIGHTS
• The reverse circulation program includes infill and extension holes following up on Thor’s successful 2022 and 2023 program, with the objective of completing a JORC mineral resource estimation.
• At Groundhog, infill drilling will be centred around high-grade uranium and vanadium mineralisation intercepted in 23WBRA020 (ASX/AIM: 29 February 2024), with extension holes up to 300m to the north and east.
- 23WBR020: 4.9m @ 1199ppm (0.12%) U3O8 and 6306ppm (0.63%) V2O5 from 82m, Including, 0.6m @ 6250ppm (0.63%) U3O8 and 30348ppm (3.0%) V2O5 from 82.6m
• At Rim Rock, infill drilling will be centred around 23WBRA011, 23WBRA012 and 23WBRA016 (ASX/AIM: 29 February 2024), with extension drilling toward the open areas to the east and south.
- 23WBR011: 6.1m @ 563ppm (0.06%) U3O8 and 9100ppm (0.9%) V2O5 from 74.7m, Including, 1.5m @ 1624ppm (0.16%) U3O8 and 19637ppm (2.0%) V2O5 from 76.2m
• Drill contractor Envirotech Drilling LLC and downhole logging contractor Jet West Geophysical Services LLC have both been secured/contracted.
With all approvals in place as announced in August, Thor is delighted to commence on ground drill site preparations for our upcoming infill and extension drill program. This highlights the Company’s direction in focusing on our main priority in the Thor portfolio, our uranium and vanadium prospects at the Wedding Bell and Radium Mountain Projects.
We look forward to updating the market when drilling commences.- Managing Director Nicole Galloway Warland
ABOUT THE
URANIUM-VANADIUM PROJECTS
LATEST
NEWS
Uranium Drilling Commences at Wedding Bell Project
Drilling has commenced at Groundhog Prospect, on the Company’s 100% owned Wedding Bell Project, located in the uranium-vanadium
mining district of the Uravan Mineral Belt, southwest Colorado, USA.
Drill Preparations Underway At Wedding Bell Uranium Project
On-ground drill site preparations are now underway for our 2024 drilling programs at Rim Rock and Groundhog mine areas, with drilling scheduled to commence in early October
Uranium Drill Approvals Granted, Wedding Bell and Radium Mountain Projects, USA
All approvals and permits have been granted to commence follow-up drilling at Wedding Bell and Radium Mountain projects including Rim Rock and Groundhog Prospects
Equity Placing to Accelerate Uranium and Copper Exploration
With the addition of these funds the Company is now in a position to plan for the next phases of exploration at its’ USA and South Australian projects.
RIU – Investor Presentation (May 2024)
Thor Energy Plc is pleased to provide investors with a chance to view the presentation slides from the Investor Presentation titled “Uranium Focus”, prepared by MD Nicole Galloway Warland, for the RIU Conference in Sydney.
High Grade Uranium and Vanadium Assays – Wedding Bell and Radium Mountain Projects, USA
Assays return up to 3,0348 ppm (3.0%) V2O5 vanadium pentoxide, with uranium assay grades up to 6,250ppm (0.63%) U3O8, consistent with the high-grade downhole gamma uranium results