The directors of Thor Energy (AIM, ASX: THR) are pleased to announce that drilling has commenced at Groundhog Prospect, on the Company’s 100% owned Wedding Bell Project, located in the uranium-vanadium mining district of the Uravan Mineral Belt, southwest Colorado, USA.
HIGHLIGHTS
Reverse Circulation (“RC”) drilling commences at Groundhog prospect.
At Groundhog, infill drilling will be centred around high-grade uranium and vanadium mineralisation intercepted in 23WBRA020 (ASX/AIM: 29 February 2024), with extension holes up to 300m to the north and east.
- 23WBR020: 4.9m @ 1199ppm (0.12%) U3O8 and 6306ppm (0.63%) V2O5 from 82m, Including, 0.6m @ 6250ppm (0.63%) U3O8 and 30348ppm (3.0%) V2O5 from 82.6m
Drilling is estimated to take approximately four weeks to complete, with downhole gamma results released to the market as they become available.
We are pleased to report drilling has now commenced at our Wedding Bell Project, with the RC drill programme commencing at our Groundhog Mine Prospect. The program is anticipated to last four weeks, with downhole gamma results released to the market as they become available.
Alastair Clayton – Executive Chairman
ABOUT THE
URANIUM-VANADIUM PROJECTS
LATEST
NEWS
Uranium Drilling Commences at Wedding Bell Project
Drilling has commenced at Groundhog Prospect, on the Company’s 100% owned Wedding Bell Project, located in the uranium-vanadium
mining district of the Uravan Mineral Belt, southwest Colorado, USA.
Drill Preparations Underway At Wedding Bell Uranium Project
On-ground drill site preparations are now underway for our 2024 drilling programs at Rim Rock and Groundhog mine areas, with drilling scheduled to commence in early October
Uranium Drill Approvals Granted, Wedding Bell and Radium Mountain Projects, USA
All approvals and permits have been granted to commence follow-up drilling at Wedding Bell and Radium Mountain projects including Rim Rock and Groundhog Prospects
Equity Placing to Accelerate Uranium and Copper Exploration
With the addition of these funds the Company is now in a position to plan for the next phases of exploration at its’ USA and South Australian projects.
RIU – Investor Presentation (May 2024)
Thor Energy Plc is pleased to provide investors with a chance to view the presentation slides from the Investor Presentation titled “Uranium Focus”, prepared by MD Nicole Galloway Warland, for the RIU Conference in Sydney.
High Grade Uranium and Vanadium Assays – Wedding Bell and Radium Mountain Projects, USA
Assays return up to 3,0348 ppm (3.0%) V2O5 vanadium pentoxide, with uranium assay grades up to 6,250ppm (0.63%) U3O8, consistent with the high-grade downhole gamma uranium results