
The directors of Thor Energy Plc (“Thor”) (AIM, ASX: THR, OTCQB: THORF) are pleased to provide an exploration update on the Company’s 100% owned Wedding Bell and Radium Mountain uranium and vanadium projects in the Uravan Mineral Belt, Colorado, USA
HIGHLIGHTS
- Assay results validate downhole gamma readings for uranium and confirm broader enriched vanadium mineralisation.
- Vanadium assay results include:
• 1.5m @ 2660ppm (0.27%) V2O5 from 83.8m (22WB012A) – Groundhog
• 1.5m @ 1776ppm (0.18%) V2O5 from 59.4m (22WB014) – Rim Rock
• 3.0m @ 1640ppm (0.16%) V2O5 from 83.8m (22WB012) – Groundhog
•1.5m @ 1026ppm (0.10%) V2O5 from 83.8m (22WB011) – Section 23 Close-spaced airborne magnetics and radiometric survey to commence over all three projects, once the ground conditions are suitably dry.
Drill permitting has commenced for follow up drilling at both Wedding Bell and Radium Mountain.
We are pleased to receive these very encouraging vanadium assay results for the selection of physical samples sent for analysis. The assay results confirm the uranium mineralisation determined by downhole gamma and highlight broader enriched vanadium haloes of up to 0.27% vanadium. These vanadium-rich halos are typical of this style of ‘Salt Wash’ sandstone-hosted uranium mineralisation.
Drill permitting is underway for our next round of drilling at Wedding Bell, and initial drilling at Vanadium King, Utah, following the airborne geophysical survey. A close-spaced airborne radiometric and magnetics survey is planned over all three projects area once the conditions are suitably dry given there is still a small amount of snow and water at present on the ground.
- Managing Director Nicole Galloway Warland
ABOUT THE
URANIUM-VANADIUM PROJECTS
LATEST
NEWS

Uranium Drilling Commences at Wedding Bell Project
Drilling has commenced at Groundhog Prospect, on the Company’s 100% owned Wedding Bell Project, located in the uranium-vanadium
mining district of the Uravan Mineral Belt, southwest Colorado, USA.

Drill Preparations Underway At Wedding Bell Uranium Project
On-ground drill site preparations are now underway for our 2024 drilling programs at Rim Rock and Groundhog mine areas, with drilling scheduled to commence in early October

Uranium Drill Approvals Granted, Wedding Bell and Radium Mountain Projects, USA
All approvals and permits have been granted to commence follow-up drilling at Wedding Bell and Radium Mountain projects including Rim Rock and Groundhog Prospects

Equity Placing to Accelerate Uranium and Copper Exploration
With the addition of these funds the Company is now in a position to plan for the next phases of exploration at its’ USA and South Australian projects.

RIU – Investor Presentation (May 2024)
Thor Energy Plc is pleased to provide investors with a chance to view the presentation slides from the Investor Presentation titled “Uranium Focus”, prepared by MD Nicole Galloway Warland, for the RIU Conference in Sydney.

High Grade Uranium and Vanadium Assays – Wedding Bell and Radium Mountain Projects, USA
Assays return up to 3,0348 ppm (3.0%) V2O5 vanadium pentoxide, with uranium assay grades up to 6,250ppm (0.63%) U3O8, consistent with the high-grade downhole gamma uranium results