
Investor Presentation – Resources Round Up (Sydney 2022)
Managing Director Nicole Galloway Warland gave this presentation and Q&A at the Resources Round Up in Sydney

Managing Director Nicole Galloway Warland gave this presentation and Q&A at the Resources Round Up in Sydney
Managing Director Nicole Galloway Warland gave at the Master Investor Show (2022) in London.

Thor is pleased to advise that pump testing and a tracer test, followed by in-situ lixiviant trials have commenced at the Kapunda Copper ISR Project in SA

The 2nd hole in the drilling program intercepted scheelite, molybdenite and chalcopyrite mineralisation within a magnetite skarn, at the Molyhil Project.

Managing Director Nicole Galloway Warland gave this technical presentation focussing on the Alford Copper-gold projects at the AusIMM Technical Lunch in Adelaide.

Thor has received favourable results from our initial pump test for preliminary hydrogeological assessment at the Alford East Copper-Gold Project

Gold in-soil anomalies define eight high quality drill-ready targets

Thor has recieved further significant copper and gold intercepts from the recently completed initial diamond drilling program at the Alford East Copper-Gold Project, SA

The Molyhil Mineral Resource Estimate now comprises Measured, Indicated, and Inferred Mineral Resources totalling 4.4 million tonnes at 0.27% WO3 (Tungsten trioxide), 0.10% Mo (Molybdenum), 0.05% Cu (Copper) and 17.75% Fe (Iron).

The directors of Thor Mining Plc (“Thor”) (AIM, ASX: THR) are pleased to announce a maiden Mineral Resource Estimate of 177,000 tonnes of contained copper and 71,500 ounces of contained gold at its Alford East copper-gold project, located on the Yorke Peninsula, South Australia